Installation of concrete elements

Prefabricate concrete elements are currently being installed on our new patented module based RAS system. 2 moduler will be installed with a annual capacity of 240 MT and it is expected to be in operation in Q4-23.

This new system will combine the functionality from round tanks and raceways in one system, at the same maintaining a low energy consumption per produced kg. fish. It also has new functions for harvesting and a more efficient removal of sludge.

Har du brug for hjælp? Så kontakt os